[Desert Sands Phase III]
Number: Grading 27443

Drawing of Record Submitted
Electronic Drawing
Final Grading Report
Date Scheduled
BUILDING PERMIT RELEASE APPROVALS
Power
Water 12/4/2003. PERMITS ONLY - okay for lot 12 only. Need final.
Wastewater 12/4/2003. PERMITS ONLY - okay for lot 12 only. Need final.
Engineering 12/4/2003. Okay for PERMITS ONLY per Mike Hester
City Development Engineer 12/15/2003. OK for PERMITS ONLY per Jay Sandberg
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 2/5/04 - corrections required per Jeff Lance. 2/3-not ready; 2/5-need drawing of record first. 2/18/04 corrections required for FINAL per Jeff Lance. Lot 278 has two water services. Lot 275 clean concrete pad and replace if bad. Lot 209 replace conrete and box with traffic box. check all services for wire. Clean out all boxes and top of cement pad. Straighten fire hydrants with street. Need arrows on valve collars. 3/16/04 corrections required per Jeff Lance. Fix everything on last inspection card. 3/24/04 Approved per Jeff Lance.
Wastewater 2/5/04 - corrections required per Jeff Lance. 2/3-not ready; 2/5-need drawing of record first. 2/18/04 corrections required for FINAL per Jeff Lance. Lot 278 has two water services. Lot 275 clean concrete pad and replace if bad. Lot 209 replace conrete and box with traffic box. check all services for wire. Clean out all boxes and top of cement pad. Straighten fire hydrants with street. Need arrows on valve collars. 3/16/04 corrections required per Jeff Lance. Fix everything on last inspection card. 3/24/04 Approved per Jeff Lance.
Engineering 3/16/04 Approved per Mike Hester.
City Development Engineer 4/24/04 approved per Jay Sandberg.
Landscaping 2/4/2004 approved per Mark Bradley - landscaping NA.
    
General Comments: