Drawing of Record Submitted |
4/29/2014 |
Electronic Drawing |
4/29/2014 |
Final Grading Report |
4/29/2014 |
Date Scheduled |
4/30/2014 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
5/01/2014 Approved per Dennis Wright
3/24/2015 Approved per Bryce Mitchell 1 year warranty |
Water |
5/01/20104 Approved per Carson Tait
3/23/2015 Corrections required Per Carson Tail.. 1 year warranty.. Need to replace the hydrant and meter box pads on the East end near detention basin |
Wastewater |
5/01/20104 Approved per Carson Tait
3/23/2015 Corrections required Per Carson Tail.. 1 year warranty.. Need to replace the hydrant and meter box pads on the East end near detention basin |
Engineering |
4/30/2014 Corrections required per Brandon Wright.. Stop signs not in place, monument not stamped
5/05/2014 Approved per Brandon Wright
3/25/2015 Corrections required per Brandon Wright 1 yr warranty.. Broken sidewalk broken ADA ramp detention basin need to be clean out |
City Development Engineer |
5/02/2014 Corrections required Per Jared Stewart STREETS DEPT ONLy.. Stop sign & street coord needed on Road D at intersections Nevada Dirve and Colorado Storm drain is good
5/12/2014 Approved per Jared Stewart.. STREETS DEPT ONLY |
Landscaping |
|
| |
General Comments: |
Red Cliffs Estates Phase 1 & 2 |