| Drawing of Record Submitted | 4/15/2014 |
|---|---|
| Electronic Drawing | 4/15/2014 |
| Final Grading Report | 4/15/2014 |
| Date Scheduled | 4/16/2014 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 4/16/14 corrections required per Kevin C. Line size and arrow on fire line. Clean out meter box so you can turn off customer valve. Plan shows 3/4" meter they put in a 1" setter? FOR CO test backflow on fire line. 4/23/14 approved per Kevin Condie. |
| Wastewater | 4/16/14 corrections required per Kevin C. Line size and arrow on fire line. Clean out meter box so you can turn off customer valve. Plan shows 3/4" meter they put in a 1" setter? FOR CO test backflow on fire line. 4/23/14 approved per Kevin Condie. |
| Engineering | 4/18/2014 Approved per Brandon Wright |
| City Development Engineer | 4/16/2014 Approved per Jared Stewart.. STREETS DEPT ONLY 4/22/2014 Approved per Wes Jenkins |
| Landscaping | 4/22/2014 Approved per Wes Jenkins |
| General Comments: | |