Drawing of Record Submitted |
5/16/2014 |
Electronic Drawing |
5/16/2014 |
Final Grading Report |
5/16/2014 |
Date Scheduled |
5/19/2014 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
5/21/2014 Approved per Kevin Condie
06/01/2015 Approved per Kevin Condie 1 year warranty |
Wastewater |
5/21/2014 Approved per Kevin Condie
06/01/2015 Approved per Kevin Condie 1 year warranty |
Engineering |
5/21/2014 Approved per Brandon Wright
7/02/2015 Corrections Required Per Brandon Wright.. 1 yr warranty..Side walk moving on Athens Drive
11/25/2015 1 year warranty approved per brandon wright |
City Development Engineer |
5/20/2014 STREETS DEPT ONLY Corrections required per John Graves:1. Drawing of record has not street names or separation of Phase 7 & 8.2. Stop sign on corner of Nagano & Rome Dr is short needs to be installed per City Drawings 3. Stop sign on corner of Athens Dr and Rome Dr is short 4. Need street name signs at point where Athens Dr turns into Barcelona Dr 5. Need stop sign on Sydney Dr and Athens Dr.. Note: Storm Drain passed per Jared Stewart
5/22/2014 Approved per John Graves Streets Dept Only |
Landscaping |
|
| |
General Comments: |
|