| Drawing of Record Submitted | 11/16/2015+12/22/2015 |
|---|---|
| Electronic Drawing | 11/16/2015+12/22/2015 |
| Final Grading Report | 11/16/2015+12/22/2015 |
| Date Scheduled | 11/19/2015+12/22/2015 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 11/19/2015 Approved per Kevin Condie (40) 12/23/2015 Corrections Required: (41) 1-Open all Valves, even on English Ivie 2-Clean out Boxes, so you can get on the customer valve 01/12/2016 Approved (41) per Kevin Condie 3-Put caps on the end of lines - Blow off's 4-As builts are wrong - change 01/20/2016 Approved per Kevin Condie |
| Wastewater | 11/19/2015 Approved per Kevin Condie (40) 12/23/2015 Corrections Required: (41) 1-Open all Valves, even on English Ivie 2-Clean out Boxes, so you can get on the customer valve 01/12/2016 Approved (41) per Kevin Condie 3-Put caps on the end of lines - Blow off's 4-As builts are wrong - change 01/20/2016 Approved per Kevin Condie |
| Engineering | 11/20/2015 Approved per Brandon Wright (40) 12/22/2015 Approved per Brandon Wrigth (41) |
| City Development Engineer | |
| Landscaping | 11/30/2015 Approved per Ray Snyder (40) 12/29/2015 Approved per Ray Snyder (41) |
| General Comments: | |