| Drawing of Record Submitted | 5/30/2014 |
|---|---|
| Electronic Drawing | 5/30/2014 |
| Final Grading Report | 6/06/2014 |
| Date Scheduled | 6/03/2014 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 6/04/2014 Approved per Kevin Condie 6/1/15 Approved per Kevin Condie 1 yr warranty. |
| Wastewater | 6/04/2014 Approved per Kevin Condie 6/1/15 Approved per Kevin Condie 1 yr warranty. |
| Engineering | 6/3/14 corrections required per Brandon W. Missing concrete. Street sign missing. Final grading report missing. 6/09/2014 Approved per Brandon Wright 5/22/2015 Approved per Brandon Wright.. 1 year warranty |
| City Development Engineer | 6/05/2014 Approved per Ed Welch STREETS DEPT ONLY 8/18/14 approved per Wes Jenkins. |
| Landscaping | 8/18/14 approved per Wes Jenkins. |
| General Comments: | |