Drawing of Record Submitted |
4/23/2014 |
Electronic Drawing |
4/23/2014 |
Final Grading Report |
4/23/2014 |
Date Scheduled |
4/24/2014 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
4/25/2014 Approved Dennis Wright |
Water |
4/28/2014 Corrections required erp Carson Tait..Need to lower the Fire hydrant Need to lower the meter box, It must be flush with the hydrant pad
5/07/2014 Approvedper Carson Tait |
Wastewater |
4/28/2014 Corrections required erp Carson Tait..Need to lower the Fire hydrant Need to lower the meter box, It must be flush with the hydrant pad
5/07/2014 Approvedper Carson Tait |
Engineering |
4/24/2014 Approved per Brandon Wright |
City Development Engineer |
4/28/2014 Approved per Wes Jenkins
4/25/2014 Approved per Jared Stewart STREETS DEPT |
Landscaping |
4/24/2014 Approved Craig Harvey |
| |
General Comments: |
|