| Drawing of Record Submitted | 9/04/2014 |
|---|---|
| Electronic Drawing | 9/04/2014 |
| Final Grading Report | 9/04/2014 |
| Date Scheduled | 09/08/2014 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 9/9/14 approved per Kevin Condie 8/5/2015 approved per Kevin Condie |
| Wastewater | 9/9/14 approved per Kevin Condie 8/5/2015 approved per Kevin Condie |
| Engineering | 9/9/14 approved per Brandon W. 8/13/15 approved per Brandon Wright |
| City Development Engineer | 9/9/14 STREETS - corrections required per John Graves. Drawing of record needs to be corrected to show correct street names. A manufacturer sticker showing the date of installation needs to be placed on the back of all city signs. 9/18/14 - STREETS - approved per Jay Smith - signs okay. 8/13/2015 Approved 1 yr warranty per Brandon Wright |
| Landscaping | |
| General Comments: | |