Drawing of Record Submitted |
11/04/2014 |
Electronic Drawing |
11/04/2014 |
Final Grading Report |
|
Date Scheduled |
11/13/2014 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
11/13/2014 Approved Per Dennis Wright
11/18/2015 approved per Jeremie Higgins |
Water |
11/14/2014 Corrections required per Brad Drummond.. Needs cement around meter boxs and fire hydrant, back flow assemblies need to be tested landscaping outside, fire riser inside
11/19/2014 Corrections required Per Brand Drummond..Concrete is good outside back flow assembly has been tested back flow at fire riser needs to be tested still
11/21/2014 Approved per Brad Drummond
12/2/15 approved |
Wastewater |
11/14/2014 Corrections required per Brad Drummond.. Needs cement around meter boxs and fire hydrant, back flow assemblies need to be tested landscaping outside, fire riser inside
11/19/2014 Corrections required Per Brand Drummond..Concrete is good outside back flow assembly has been tested back flow at fire riser needs to be tested still
11/21/2014 Approved per Brad Drummond
12/2/15 approved |
Engineering |
11/19/2014 Approved per Brandon Wright
11/20/2015 Approved 1 yr warranty per Brandon Wright |
City Development Engineer |
11/13/2014 Streets Dept Only.. NEED 10% Warranty Bond
11/20/2014 Approved per Wes Jenkins Rcvd Bond |
Landscaping |
11/13/2014 Corrections required per John Willis Street Trees are not installed per Old approved Plans
11/20/2014 Approved per John Willis |
| |
General Comments: |
|