[Focus Eye Center]
Number: Grading-46452

Drawing of Record Submitted 11/04/2014
Electronic Drawing 11/04/2014
Final Grading Report
Date Scheduled 11/13/2014
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power 11/13/2014 Approved Per Dennis Wright 11/18/2015 approved per Jeremie Higgins
Water 11/14/2014 Corrections required per Brad Drummond.. Needs cement around meter boxs and fire hydrant, back flow assemblies need to be tested landscaping outside, fire riser inside 11/19/2014 Corrections required Per Brand Drummond..Concrete is good outside back flow assembly has been tested back flow at fire riser needs to be tested still 11/21/2014 Approved per Brad Drummond 12/2/15 approved
Wastewater 11/14/2014 Corrections required per Brad Drummond.. Needs cement around meter boxs and fire hydrant, back flow assemblies need to be tested landscaping outside, fire riser inside 11/19/2014 Corrections required Per Brand Drummond..Concrete is good outside back flow assembly has been tested back flow at fire riser needs to be tested still 11/21/2014 Approved per Brad Drummond 12/2/15 approved
Engineering 11/19/2014 Approved per Brandon Wright 11/20/2015 Approved 1 yr warranty per Brandon Wright
City Development Engineer 11/13/2014 Streets Dept Only.. NEED 10% Warranty Bond 11/20/2014 Approved per Wes Jenkins Rcvd Bond
Landscaping 11/13/2014 Corrections required per John Willis Street Trees are not installed per Old approved Plans 11/20/2014 Approved per John Willis
    
General Comments: