[Tupelo Phase 1]
Number: Grading-46453

Drawing of Record Submitted 6/10/2014
Electronic Drawing 6/10/2014
Final Grading Report 6/10/2014
Date Scheduled 6/12/2014
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 6/16/14 Corrections required Per Kevin Condie NOT READY 7/17/2014 Approved per Kevin Condie 6/1/15 Approved per Kevin Condie. 1 yr warranty.
Wastewater 6/16/14 Corrections required Per Kevin Condie NOT READY 7/17/2014 Approved per Kevin Condie 6/1/15 Approved per Kevin Condie. 1 yr warranty.
Engineering 6/12/2014 Corrections Required per Brandon Wright..1. Side walk no finished 2. Street & Stop signs not installed 3. Missing end of road markers 6/26/2014 Approved per Brandon Wright 6/18/2015 - verbal per Brandon Wright - approved 1 yr warranty
City Development Engineer 6/13/2014 Approved per Jared Stewart.. STREETS DEPT ONLY.. Storm drains passed, signs passed
Landscaping 9/29/14 approved per mark Goble.
    
General Comments: