Mulberry Estates Phase 6
Number: Grading-46454

Drawing of Record Submitted 8/01/2014
Electronic Drawing 8/01/2014
Final Grading Report 8/01/2014
Date Scheduled 8/04/2014
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 8/07/2014 Approved per Kevin Condie 6/1/14 Approved per Kevin Condie. 1 yr warranty
Wastewater 8/07/2014 Approved per Kevin Condie 6/1/14 Approved per Kevin Condie. 1 yr warranty
Engineering 8/04/2014 Approved per Brandon Wright.. NOTE: Lot numbers have changed they are different then Const. drawings ok per Wes Jenkins 7/02/2015 Corrections required per Brandon Wright.. 1 yr warrant curb & walk settling 8/20/2015 Corrections required per Brandon Wright.. 1 yr warranty curb and sidewalk 10/9/15 verbal from Brandon Wright - engineering approval (gs)
City Development Engineer 8/06/2014 Approved per Jared Stewart Streets Dept Only
Landscaping
    
General Comments: