| Drawing of Record Submitted | |
|---|---|
| Electronic Drawing | |
| Final Grading Report | |
| Date Scheduled | 8/04/2014 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 8/07/2014 Approved per Kevin Condie 8/25/2015 Corrections required... Punch list is not done per Kevin Condie 11/18/2015 Approved 1 yr warranty per Kevin Condie |
| Wastewater | 8/07/2014 Approved per Kevin Condie 8/25/2015 Corrections required... Punch list is not done per Kevin Condie 11/18/2015 Approved 1 yr warranty per Kevin Condie |
| Engineering | 8/04/2014 Approved per Brandon Wright.. Note: Lot Number have changed they are different thru const drawing ok per Wes Jenkins 8/4/2015 1 yr warranty Corrections Required. Water meter box settled side way sunk 10/9/15 verbal approval per Brandon Wright (gs) |
| City Development Engineer | 8/06/2014 Approved per Jared Stewart Streets Dept Only |
| Landscaping | |
| General Comments: | |