Tobler Subdivision
Number: Grading 29708

Drawing of Record Submitted 10/6/2003
Electronic Drawing 3/18/04
Final Grading Report
Date Scheduled
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer 3/18/04. Approved per Jay Sandberg.
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power 3/17/04. Approved per Dennis Wright.
Water 05/21/04. Corrections required per Kevin Condie. Move water service, arrow on values and size, W in curb. 8/4/2008 Corrections required Per Kevin COndie.. No arrows or line sizes in value collars reinspect on Final, first final was w/Jeff Lance
Wastewater 05/21/04. Corrections required per Kevin Condie. Move water service, arrow on values and size, W in curb. 8/4/2008 Corrections required Per Kevin COndie.. No arrows or line sizes in value collars reinspect on Final, first final was w/Jeff Lance
Engineering 3/18/04 - corrections required per Larry Henderson. Replace broken sidewalk. Remove construction material from sidewalk. Backfill or landscape behind sidewalk. Pour meter collars. Mark curb at sewer and water services. Clean out inlet boxes. Remove landscape rock from street. Clean streets, curbs and walks. 3/29/04. approved per Larry Henderson
City Development Engineer 3/30/04 - Aproved per Jay. Electronic as built okay. As built okay. Plat is recorded.
Landscaping 3/18/04 Corrections required per Mark Bradley. Install landscaping. 3/29/04 - Parks will sign off on each lot for CO. N/A for final.
    
General Comments: