Drawing of Record Submitted |
10/6/2003 |
Electronic Drawing |
3/18/04 |
Final Grading Report |
|
Date Scheduled |
|
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
3/18/04. Approved per Jay Sandberg. |
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
3/17/04. Approved per Dennis Wright. |
Water |
05/21/04. Corrections required per Kevin Condie. Move water service, arrow on values and size, W in curb.
8/4/2008 Corrections required Per Kevin COndie.. No arrows or line sizes in value collars reinspect on Final, first final was w/Jeff Lance |
Wastewater |
05/21/04. Corrections required per Kevin Condie. Move water service, arrow on values and size, W in curb.
8/4/2008 Corrections required Per Kevin COndie.. No arrows or line sizes in value collars reinspect on Final, first final was w/Jeff Lance |
Engineering |
3/18/04 - corrections required per Larry Henderson. Replace broken sidewalk. Remove construction material from sidewalk. Backfill or landscape behind sidewalk. Pour meter collars. Mark curb at sewer and water services. Clean out inlet boxes. Remove landscape rock from street. Clean streets, curbs and walks.
3/29/04. approved per Larry Henderson |
City Development Engineer |
3/30/04 - Aproved per Jay. Electronic as built okay. As built okay. Plat is recorded. |
Landscaping |
3/18/04 Corrections required per Mark Bradley. Install landscaping.
3/29/04 - Parks will sign off on each lot for CO. N/A for final. |
| |
General Comments: |
|