Drawing of Record Submitted |
5/26/2015 |
Electronic Drawing |
5/26/2015 |
Final Grading Report |
5/26/2015 |
Date Scheduled |
5/27/2015 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
5/28/2015 Approved per Kevin Condie
3/2/2016 Approved 1 year warranty per Kevin Condie |
Wastewater |
5/28/2015 Approved per Kevin Condie
3/2/2016 Approved 1 year warranty per Kevin Condie |
Engineering |
5/28/2015 Approved per Brandon Wright
3/9/2016 Approved 1 year warranty per Brandon Wright |
City Development Engineer |
|
Landscaping |
5/27/2015 Corrections required per Wes Jenkins Need to grade Trail provide Bonds Need to Bond for exterior Sidewalks |
| |
General Comments: |
|