Mulberry Phase 9
Number: Grading-46457

Drawing of Record Submitted 5/26/2015
Electronic Drawing 5/26/2015
Final Grading Report 5/26/2015
Date Scheduled 5/27/2015
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 5/28/2015 Approved per Kevin Condie 3/2/2016 Approved 1 year warranty per Kevin Condie
Wastewater 5/28/2015 Approved per Kevin Condie 3/2/2016 Approved 1 year warranty per Kevin Condie
Engineering 5/28/2015 Approved per Brandon Wright 3/9/2016 Approved 1 year warranty per Brandon Wright
City Development Engineer
Landscaping 5/27/2015 Corrections required per Wes Jenkins Need to grade Trail provide Bonds Need to Bond for exterior Sidewalks
    
General Comments: