| Drawing of Record Submitted | 5/26/2015 |
|---|---|
| Electronic Drawing | 5/26/2015 |
| Final Grading Report | 5/26/2015 |
| Date Scheduled | 5/27/2015 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 5/28/2015 Approved per Kevin Condie 3/2/2016 Approved 1 year warranty per Kevin Condie |
| Wastewater | 5/28/2015 Approved per Kevin Condie 3/2/2016 Approved 1 year warranty per Kevin Condie |
| Engineering | 5/28/2015 Approved per Brandon Wright 3/9/2016 Approved 1 year warranty per Brandon Wright |
| City Development Engineer | |
| Landscaping | 5/27/2015 Corrections required per Wes Jenkins Need to grade Trail provide Bonds Need to Bond for exterior Sidewalks |
| General Comments: | |