Drawing of Record Submitted |
8/07/2014 8/14/2014 |
Electronic Drawing |
8/07/2014 8/14/2014 |
Final Grading Report |
8/07/2014 8/14/2014 |
Date Scheduled |
8/11/2014 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
8/14/2014 Approved per Kevin Condie.. May have to redo valve in River Road on One year warranty
11/20/2015 Approved 1 yr warranty per Kevin Condie |
Wastewater |
8/14/2014 Approved per Kevin Condie.. May have to redo valve in River Road on One year warranty
11/20/2015 Approved 1 yr warranty per Kevin Condie |
Engineering |
8/13/2014 Corrections required per Brandon Wright.. Drawing of record is not correct street names are wrong
8/20/2014 Approved per Brandon Wright
7/31/2015 Corrections required Per Brandon Wright..North end of Shelle Dr Road & side walk failing storm drain pipe installed across sidewalk need to be into storm drain box remove from existing location. Storm drain trench on Talus Way failing cracked curb needs to be sealed. |
City Development Engineer |
8/14/2014 Corrections required Streets Dept Only.. Per Jared Stewart.. Curb inlet #8 need grout around back of inlet. Curb inlet at Lot #96 needs to be cleaned out form pile of concrete. Curb inlet on River Road by detention basin need concrete removed from box and 12" pipe cut flesh with box wall. Roundabout signs need to be 7H to the bottom of signs. Street names on drawing of Record are different than on signs on Dihedral Dr- Crux Dr and Sprag Lane-Talas Drive 8/21/2014 Approved per Jared Stewart Streets Dept Only |
Landscaping |
|
| |
General Comments: |
|