| Drawing of Record Submitted | 11/17/03 Received Asbuilts |
|---|---|
| Electronic Drawing | |
| Final Grading Report | |
| Date Scheduled | |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | 10/7/2003. Approved per Dennis Wright -- pwer OK for final. |
| Water | 10/17/2003. corrections required per Jeff Lance. Need to clean out meter boxes, remove concrete. Fix everything marked in white paint. Replace meter boxes if in backwards. 11/26/03 Correction required per Jeff Lance. Need drawing of record. 12/11/2003. Approved per Jeff Lance |
| Wastewater | 10/17/2003. corrections required per Jeff Lance. Need to clean out meter boxes, remove concrete. Fix everything marked in white paint. Replace meter boxes if in backwards. 11/26/03 Correction required per Jeff Lance. Need drawing of record. 12/11/2003. Approved per Jeff Lance |
| Engineering | 10/7/2003. Corrections required. backfill behind curbs. Trim expansion joints. Seal cracks in curb. replace broken sidewalk. Clean out inlet boxes. Need Drawing of record and final grading report. 11/24/03. Corrections required per Larry Henderson. Monuments not to city spec. |
| City Development Engineer | 10/10/2003. Corrections required per Cathie. Drawing of record, Electronic drawing of record, final grading report, certificate of improvements. 12/23/2003. Approved per Cathy Hasfurther. Electronic drawing of record - ties to SMH okay. Certificate of development - okay. |
| Landscaping | 10/10/2003 Approved per Doug W. |
| General Comments: | |