Drawing of Record Submitted |
11/17/03 Received Asbuilts |
Electronic Drawing |
|
Final Grading Report |
|
Date Scheduled |
|
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
10/7/2003. Approved per Dennis Wright -- pwer OK for final. |
Water |
10/17/2003. corrections required per Jeff Lance. Need to clean out meter boxes, remove concrete. Fix everything marked in white paint. Replace meter boxes if in backwards.
11/26/03 Correction required per Jeff Lance. Need drawing of record.
12/11/2003. Approved per Jeff Lance |
Wastewater |
10/17/2003. corrections required per Jeff Lance. Need to clean out meter boxes, remove concrete. Fix everything marked in white paint. Replace meter boxes if in backwards.
11/26/03 Correction required per Jeff Lance. Need drawing of record.
12/11/2003. Approved per Jeff Lance |
Engineering |
10/7/2003. Corrections required. backfill behind curbs. Trim expansion joints. Seal cracks in curb. replace broken sidewalk. Clean out inlet boxes. Need Drawing of record and final grading report.
11/24/03. Corrections required per Larry Henderson. Monuments not to city spec. |
City Development Engineer |
10/10/2003. Corrections required per Cathie. Drawing of record, Electronic drawing of record, final grading report, certificate of improvements.
12/23/2003. Approved per Cathy Hasfurther. Electronic drawing of record - ties to SMH okay. Certificate of development - okay. |
Landscaping |
10/10/2003 Approved per Doug W. |
| |
General Comments: |
|