Drawing of Record Submitted |
11/16/2014 |
Electronic Drawing |
11/16/2014 |
Final Grading Report |
11/16/2014 |
Date Scheduled |
11/18/2014 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
11/18/2014 Approved per Dennis Wright
11/18/2015 Approved per Jeremie Higgins |
Water |
11/19/2014 Corrections required per Brad D. No service for Lot#15 Valves need to be marked with direction arrows and size in collars
12/04/2014 Approved per Carson Tait
12/07/2015 Approved 1 yr warranty per Kevin Condie |
Wastewater |
11/19/2014 Corrections required per Brad D. No service for Lot#15 Valves need to be marked with direction arrows and size in collars
12/04/2014 Approved per Carson Tait
12/07/2015 Approved 1 yr warranty per Kevin Condie |
Engineering |
11/18/2014 Approved per Brandon Wright
11/30/15 Approved per Brandon Wright |
City Development Engineer |
11/19/2014 Approved per Jared Stewart Street Dept Only |
Landscaping |
11/20/2014 Approved per John Willis |
| |
General Comments: |
|