Drawing of Record Submitted |
12/12/2014 |
Electronic Drawing |
12/12/2014 |
Final Grading Report |
12/12/2014 |
Date Scheduled |
12/17/2014 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
12/17/2014 Approved per Dennis Wright
01/21/2016 1 Yr warranty Corrections required: Transformer and Voit need ballards around equipment per Bryce Mitchell
2/10/2016 Approved 1 yr warranty per Bryce Mitchell |
Water |
01/05/2015 Approved per Carson Tait.. The back flow assemblies have not been tested
01/21/2016 Approved 1 year warranty per Carson Tait. |
Wastewater |
01/05/2015 Approved per Carson Tait.. The back flow assemblies have not been tested
01/21/2016 Approved 1 year warranty per Carson Tait. |
Engineering |
12/18/2014 Approved per Brandon Wright
1/21/16 1 year warranty approved per Brandon Wright |
City Development Engineer |
12/18/2014 Corrections required per Streets Dept only.. John Graves Stop signs need to be at minimum 7ft to bottom of shield Sign bases need to be 2-3" above landscaping. 1700 East St coord needs to be repaired
12/29/2014 Corrections required per John Graves.. Same as above comments
2/05/2015 Approved Per Brandon Wright Streets Dept |
Landscaping |
12/18/2014 Approved per Ray Synder |
| |
General Comments: |
|