Drawing of Record Submitted |
6/16/15/Revised 6/18/15/6/24/15 |
Electronic Drawing |
6/16/15/Revised 6/18/15/6/24/15 |
Final Grading Report |
6/16/15 |
Date Scheduled |
6/17/15 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
6/19/2015 Corrections required Per Kevin Condie..Need to fill & flush line, @ intersection of Desert Canyon & desert Crest stub going south if they are not going to us it needs to be Guardrail @ Desert Canyon & Rim Runner need to see if I can get valve wrench on valve can't are not straight need a valve extension
6/25/2015 Approved per Kevin Condie..Note Per Phone
3/1/2016 Approved 1 year warranty per Kevin Condie |
Wastewater |
6/19/2015 Corrections required Per Kevin Condie..Need to fill & flush line, @ intersection of Desert Canyon & desert Crest stub going south if they are not going to us it needs to be Guardrail @ Desert Canyon & Rim Runner need to see if I can get valve wrench on valve can't are not straight need a valve extension
6/25/2015 Approved per Kevin Condie..Note Per Phone
3/1/2016 Approved 1 year warranty per Kevin Condie |
Engineering |
6/18/2015 Approved per Brandon Wright
3/14/2016 Approved 1 year warranty per Brandon Wright.
8/11/2016 1 year impr approved per Tom Cullison |
City Development Engineer |
|
Landscaping |
6/25/2015 Corrections required: Landscape strip along Desert Canyons Parkway needs to be complete. Needs Bonds. |
| |
General Comments: |
received warranty bond 7/8/2015 (GS) |