Drawing of Record Submitted |
07/30/2004 |
Electronic Drawing |
|
Final Grading Report |
07/30/2004 |
Date Scheduled |
|
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
DREA |
Water |
08/09/04 Corrections Required. Per Carson Tait. Need to add the corner lot 3/4" water service before calling for a final inspection.
08/18/2004 Approved per Boyd. |
Wastewater |
08/09/04 Corrections Required. Per Carson Tait. Need to add the corner lot 3/4" water service before calling for a final inspection.
08/18/2004 Approved per Boyd. |
Engineering |
08/03/04. Corrections required per Mike Hester. 1. Backfill all sidewalk A minimun of 1' beyond the back of walk. 2. Install traffic control and street name signs. 3. Install all property corners. 4. Install monumentation. 5.
the drawing of record.
08/17/04. Approved per Mike Hester. |
City Development Engineer |
08/20/04. Approved Per Cathy |
Landscaping |
08/02/04. Approved Per Mark Bradley |
| |
General Comments: |
|