Power |
05/03/2006 Corrections required per Dennis Wright. No Utilities placed for all lots at this time.
09/01/2006 Approved per Dennis Wright.. Power installed no other development done.
12/10/2007 Approved per Dennis Wright.. 1 yr warranty |
Water |
1/3/07 Approved with conditions per Tim Dotson - lot 1 okay. Lots 2 and 3 to be improved by owners (Received by Cathy H). Prior to CO on lot 1 - setter/meter must be collared per St George Specs.
12/11/2007 Approved per Tim Dotson 1 yr warranty |
Wastewater |
1/3/07 Approved with conditions per Tim Dotson - lot 1 okay. Lots 2 and 3 to be improved by owners (Received by Cathy H). Prior to CO on lot 1 - setter/meter must be collared per St George Specs.
12/11/2007 Approved per Tim Dotson 1 yr warranty |
Engineering |
1/3/07 Approved per Carlos R.
12/17/2007 Approved per Calros Robles 1yr warranty |
City Development Engineer |
5/4/06 - Corrections REQUIRED per Wes Jenkins - complete improvements per plan.
9/29/06 Corrections Required per Cathy H. Requires letter from owner of lots 2 & 3 on utility installation.
1/2/07 Approved per Cathy H . Received recorded letter - owners to make utility improvements
12/12/07 - 1 year warranty - approved per Ken B. |
Landscaping |
05/02/2006 Approved per Mark Bradley..N/A
12/12/07 - 1 year warranty - approved per Ken B. |
| |