Drawing of Record Submitted |
05/16/2007 |
Electronic Drawing |
05/16/2007 |
Final Grading Report |
05/16/2007 |
Date Scheduled |
05/17/2007 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
5/21/2007 Approved Per Wayne M.
4/21/2008 Approved Per Carson Tait.. 1 yr warranty |
Wastewater |
5/21/2007 Approved Per Wayne M.
4/21/2008 Approved Per Carson Tait.. 1 yr warranty |
Engineering |
05/17/2007 Corrections require dper Carlos Robles.. Finish project and clean up site
5/24/2007 Approved per Carlos Robles
6/8/07 approved per Carlos Robles.
4/3/2008 Apprpved per Brandon Wright.. 1 yr warranty |
City Development Engineer |
5/19/07 corrections required per Cathy H - Provide electronic dwg of record in autocad (dwg) format on the city HCN coordinate system. Per Ken B - general cleanup needed. Construction still in process. Spauling and pitting of asphalt.
5/31/07 approved per Cathy H. |
Landscaping |
05/19/2007 Corrections required per Ken Bricker.. Clean up site
5/21/07 approved per Ken B. |
| |
General Comments: |
|