Drawing of Record Submitted |
9/18/2007 |
Electronic Drawing |
9/18/2007 |
Final Grading Report |
9/18/2007 |
Date Scheduled |
9/19/2007 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
9/21/2007 Approved per Dennis Wright
1/2/2009 Approved per Dennis Wright..1 year warranty |
Water |
9/20/2007 Corrections required per Kevin Condie..Replace box on #lot711,fix box on lot #727, clean boxes, check wire, turn hydrant in cul-du- sac
10/09/2007 Approved per Kevin Condie
1/9/09 - 1 year warranty - approved per Kevin C. |
Wastewater |
9/20/2007 Corrections required per Kevin Condie..Replace box on #lot711,fix box on lot #727, clean boxes, check wire, turn hydrant in cul-du- sac
10/09/2007 Approved per Kevin Condie
1/9/09 - 1 year warranty - approved per Kevin C. |
Engineering |
9/19/2007 Corrections required per Brandon Wright.. Monuments not stamped,shoulder side walks
9/28/2007 Approved Per Brandon Wright
1/8/09 - 1 year warranty - Corrections required per Brandon W. Asphalt opening up around sewer collar in front of #715. Broken walk in fron tof #727. Settling sewer #706. Settling in fron tof $741 & #701. |
City Development Engineer |
9/20/07 corrections required per Cathy H. 10% warranty Bond. 120% improvement guarantee bond for Ledges Parkway (East of 2nd access) and Landscaping. Electronic DWG of record needs to fit city HCN system. per Ken B - No landscaping present.
9/28/07 corrections required per Cathy H. 10% warranty bond. 120% improvement guarantee for Ledges Pkwy & Landscaping.
2/5/08 approved per Cathy H.
1/7/09 - 1 year warranty - approved per Ken B. |
Landscaping |
9/20/07 corrections required per Cathy H. 10% warranty Bond. 120% improvement guarantee bond for Ledges Parkway (East of 2nd access) and Landscaping. Electronic DWG of record needs to fit city HCN system. per Ken B - No landscaping present.
9/28/07 corrections required per Cathy H. 10% warranty bond. 120% improvement guarantee for Ledges Pkwy & Landscaping.
2/5/08 approved per Cathy H.
1/15/2009 Corrections required per Doug W.. 1 year warranty.. no landscaping is installed in phase 7?here is one spec home or modu home that is landscape |
| |
General Comments: |
|