Drawing of Record Submitted |
4/3/2008 |
Electronic Drawing |
4/3/2008 |
Final Grading Report |
4/3/200/ |
Date Scheduled |
4/7/2008 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
4/7/08 corrections required per Carson Tait. Need to test and tag the backflow assemblies on the irrigation systems.
4/28/2008 Approved per Carson Tait
6/15/2009 Approved per Carson Tait.. 1 year warranty |
Wastewater |
4/7/08 corrections required per Carson Tait. Need to test and tag the backflow assemblies on the irrigation systems.
4/28/2008 Approved per Carson Tait
6/15/2009 Approved per Carson Tait.. 1 year warranty |
Engineering |
4/9/08 approved per Brandon W. 1 cylinder test shown for project. Private owner responsible for failed tests.
4/3/2009 Corrections required Per Brandon Wright..1 year warranty.. Water trench in Factory Drive needs to be sealed West Drive approach needs to be Sicaflexed on West side of radius |
City Development Engineer |
4/7/08 corrections required per Cathy H. Electronic DWG of record needs to show how the 3 detention basins drain to public facilities. per Ken B. Gas meter guard rail has not been set, perimeter fencing not complete
4/25/08 corrections required per Ken B. Missing stop sign at access. Chain link fence at front must be replaced with solid non-see thru fencing.
5/6/08 approved per Ken B. Fence okay per approved site plan. Signs okay per approved site plan.
4/1/09 - 1 year warranty - private improvements only - NA per Cathy H. |
Landscaping |
4/7/08 corrections required per Ken B. Gas meter guard rail has not been set, perimeter fencing not complete.
4/25/08 approved per Cathy H.
4/15/09 - 1 YEAR WARRANTY - approved per Pam Klotz |
| |
General Comments: |
|