Drawing of Record Submitted |
10/10/2007 |
Electronic Drawing |
10/10/2007 |
Final Grading Report |
10/10/2007 |
Date Scheduled |
10/11/2007 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
10/12/07 corrections required per Carson Tait. The water service for lot 1 must be on lot 1 to meet our standards. Page 3-44 3.6.8.3
10/25/2007 Approved per Carson Tait
9/30/2008 Approved per Carson Tait.. 1yr warranty Wire Good |
Wastewater |
10/12/07 corrections required per Carson Tait. The water service for lot 1 must be on lot 1 to meet our standards. Page 3-44 3.6.8.3
10/25/2007 Approved per Carson Tait
9/30/2008 Approved per Carson Tait.. 1yr warranty Wire Good |
Engineering |
10/24/2007 Approved per Carlos Robles
10/28/2008 Approved per Carlos Robles 1 yr warranty |
City Development Engineer |
10/15/07 corrections required per Cathy H. Place rip rap on North end where curb and sidewalk end. Slope dirt from sidewalk to natural grade. Patch cut in road on South end of project (full width of road). 10% warranty bond.
10/26/07 approved per Ken B.
9/9/08 - 1 year warranty - approved per Ken B. |
Landscaping |
10/15/07 corrections required per Cathy H. Place rip rap on North end where curb and sidewalk end. Slope dirt from sidewalk to natural grade. Patch cut in road on South end of project (full width of road). 10% warranty bond.
10/26/07 approved per Ken B.
9/9/08 - 1 year warranty - approved per Ken B. |
| |
General Comments: |
|