Drawing of Record Submitted |
7/30/2007..revised 8/7/07 |
Electronic Drawing |
7/30/2007..revised 8/7/07 |
Final Grading Report |
7/30/2007 |
Date Scheduled |
8/01/2007 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
7/31/07 corrections required per Darrin Judd. Fire line duel check needs to be tested and tagged before CO can pass.
8/9/2007 Corrections required per Carson Tait.. Valve in River Road must be collared, this collar msut be round. The Fire hydrant and valves must be be collared.
8/17/2007 Corrections required per Carson tait.. Need a concrete valve collar in River Road it must be round. Need the Fire hydrant pad and Fire line valve collared. This will be the 3rd inspeciton for the same items.
8/24/2007 Approved per Carson Tait
7/7/2008 Approved per Carson Tait.. 1 year warranty.. wire good |
Wastewater |
7/31/07 corrections required per Darrin Judd. Fire line duel check needs to be tested and tagged before CO can pass.
8/9/2007 Corrections required per Carson Tait.. Valve in River Road must be collared, this collar msut be round. The Fire hydrant and valves must be be collared.
8/17/2007 Corrections required per Carson tait.. Need a concrete valve collar in River Road it must be round. Need the Fire hydrant pad and Fire line valve collared. This will be the 3rd inspeciton for the same items.
8/24/2007 Approved per Carson Tait
7/7/2008 Approved per Carson Tait.. 1 year warranty.. wire good |
Engineering |
7/31/2007 Corrections required per Brandon W.. Curb box replaced, fix settling around DI box on River Road, wall? Eng
8/8/2007 Approved per Brandon W
7/7/08 - 1 year warranty - approved per Brandon W.
|
City Development Engineer |
7/31/07 corrections required per Cathy H. Electronic dwg of record needs to be placed in city HCN system. per Ken B. Curb shoulders need R/R. Drop off at end of parking. Pavement at start of gravel line. Storm drain is filling with rocks at rear of building (needs to be paved). Required standard size stop signs. Large dumpster still sitting in parking lot.
8/8/2007 Approved per Cathy H
7/7/08 - 1 year warranty - private improvements only - approved per Cathy H. |
Landscaping |
7/31/07 corrections required per Cathy H. Electronic dwg of record needs to be placed in city HCN system. per Ken B. Curb shoulders need R/R. Drop off at end of parking. Pavement at start of gravel line. Storm drain is filling with rocks at rear of building (needs to be paved). Required standard size stop signs. Large dumpster still sitting in parking lot.
8/8/2007 Approved per Ken B
7/7/08 - 1 year warranty - private improvements only - approved per Cathy H. |
| |
General Comments: |
|