Drawing of Record Submitted |
10/30/2007 |
Electronic Drawing |
10/30/2007 |
Final Grading Report |
11/29/2007 |
Date Scheduled |
11/01/2007 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
10/31/2007 Approved per Dennis Wright
11/04/2008 Approved per Dennis Wright 1 yr warranty |
Water |
11/07/2007 Corrections per Darrin Judd.. Need to uncover valve can lid on hydrant on Southeast corner of project. backflow assembly needs to be tested and tagged. Arrows add line size need to be cut on concrete at T on the Northwest side of project.
12/11/2007 Approved per Carson Tait
11/13/2008 Approved per Carson Tait..1 year warranty.. wire good |
Wastewater |
11/07/2007 Corrections per Darrin Judd.. Need to uncover valve can lid on hydrant on Southeast corner of project. backflow assembly needs to be tested and tagged. Arrows add line size need to be cut on concrete at T on the Northwest side of project.
12/11/2007 Approved per Carson Tait
11/13/2008 Approved per Carson Tait..1 year warranty.. wire good |
Engineering |
11/01/2007 Approved per Carlos Robles.. 2 Year warratny required on South frontage road landscaping not completed.
4/2/09 - 1 year warranty - approved per Carlos R. |
City Development Engineer |
10/31/2007 Corrections required per Ken Bricker.. Construction still in process,safety fence is needed at frontage wall(one to drop off)No doors/gates on trash enecloure guards are needed at front detention areas,landscape still be installed.
11/6/07 corrections required per Cathy H. Electronic dwg of record needs to show all drainage improvements and detention basin locations with capacity on site (TaiPan).
11/30/2007 Corrections required per Cathy H.1. See previous comments from 10-31-07 for Electronic Dwg of Record. Needs storm drain info. 2. Drainage along 850 North at East end needs to be addressed. 3.End of Road markers needed at far Southeast corner of parking lot, construction mat'l. at back of building.4. Trash enclosure is missing solid metal door 5. Guards are needed at front detention areas(driving hazard). 6. End road markers needed at front accesses. 7. Resolve slopes and steepness of detention basin.(Safety Hazard).
Approved per Cathy H..Add end of Road markers on East ans South side of South East side of parking lot.
11/4/08 - 1 year warranty - approved per Ken B. |
Landscaping |
10/31/2007 Corrections required per Ken Bricker.. Construction still in process safety fence is needed at Frontage wall(one to drop off)No doors/gates on trash enclosure.guards are needed at front detention areas, landscape still be installed.
11/30/2007 Corrections per Cathy H.1. See previous comments from 10-31-07 for Electronic Dwg of Record. Needs storm drain info. 2. Drainage along 850 North at East end needs to be addressed. 3.End of Road markers needed at far Southeast corner of parking lot, construction mat'l. at back of building.4. Trash enclosure is missing solid metal door 5. Guards are needed at front detention areas(driving hazard). 6. End road markers needed at front accesses. 7. Resolve slopes and steepness of detention basin.(Safety Hazard).
Approved per Cathy H..Add end of Road markers on East ans South side of South East side of parking lot.
11/19/2008 Approved per Larry Shane.. 1 year warranty |
| |
General Comments: |
|