Drawing of Record Submitted |
4-17-2009..revised 5/15/09 |
Electronic Drawing |
4-17-2009..revised 5/15/09 |
Final Grading Report |
4/24/2009 |
Date Scheduled |
4/28/2009 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
4/28/2009 Approved per Dennis Wright |
Water |
5/11/2009 Corrections required per Kevin Condie..1. Need to check wire, 2. Check all valve, that they are open, 3. Check back flow on Irr sprinklers
5/20/09 approved per Kevin C - per Telephone. |
Wastewater |
5/11/2009 Corrections required per Kevin Condie..1. Need to check wire, 2. Check all valve, that they are open, 3. Check back flow on Irr sprinklers
5/20/09 approved per Kevin C - per Telephone. |
Engineering |
4/29/09 corrections required per Brandon W. Signing is not complete. Bumpers are not installed. Landscape not complete.
5/18/2009 Approved per Brandon Wright |
City Development Engineer |
4/28/2009 Corrections required per Cathy H.. 1. Elec Dwg of record is missing some drainage info as far as invert elevation, catch basin info and inverts by easterly access, flowlines in & out of 2700 of detention area. missing grate and invert info in basement storm drain.
5/18/09 approved per Cathy H. Electronic DWG of record OK. |
Landscaping |
4/28/2009 Corrections required per Ken Bricker.. Most of landscaping is missing.
5/20/09 approved per Laura Taylor. |
| |
General Comments: |
|