Drawing of Record Submitted |
7/18/2014 |
Electronic Drawing |
7/18/2014 |
Final Grading Report |
7/18/2014 |
Date Scheduled |
7/22/2014 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
7/23/2014 Approved per Kevin Condie
8/5/2015 Approved 1 yr warranty per Kevin Condie |
Wastewater |
7/23/2014 Approved per Kevin Condie
8/5/2015 Approved 1 yr warranty per Kevin Condie |
Engineering |
7/22/2014 Approved per Brandon Wright
8/14/2015 Approved 1 yr Warranty per Brandon Wright |
City Development Engineer |
7/23/2014 Corrections required Per Streets Dept Only..Per Jared Stewart.. Install R6-SP roundabout signs below the yield signs as required by the MUTCD for a mini roundabout
8/13/2014 STREETS DEPT ONLY.. corrections required Per John Graves.. The new roundabout sign that was installed must be at least 6ft off the ground and can not intrude the sidewalk or walking path ;more than 4 inches If intrusion is more than 4" signs must be 7ft off the ground
8/18/2014 Approved per Jared Stewart Streets Dept Only |
Landscaping |
|
| |
General Comments: |
|